Reduce Lead Time With Quick Response Manufacturing

Created by: Suri Consulting & Seminars
4.5 1,816 views
Last Updated 02/2026
English
30-Day Money Back Guarantee
Full Lifetime Access
Finish in
45 mins! Run Time
Made for for
Supervisors
No Certificate
Provided
Mobile -
Friendly
Access

Description

Executive Level Overview. Quick Response Manufacturing (QRM) is a companywide strategy for lead time reduction throughout the enterprise, and is particularly suited to companies making high-mix, low-volume or custom products. Using QRM, such companies have reduced their lead times by as much as 80-90%. As a result these companies have not only seen large increases in market share, but also experienced 15-20% cost reductions and huge quality improvements. In addition, companies find that the lead time and cost reductions resulting from QRM enable them to compete effectively against low-cost countries.

This course provides an overview of QRM strategy, which includes four core concepts:

  1. The Power of Time: The numerous reasons why lead time is important (much more important than most managers realize), how it influences total operating cost and quality, and how to take advantage of this realization. 
  2. Organizational Structure: How to restructure your organization to minimize lead time throughout the enterprise, both on the shop floor and in the office.
  3. System Dynamics: How interactions between machines, people and products impact your lead times. As a result, capacity planning policies (e.g. machine and labor utilization) need to be rethought for QRM.
  4. Enterprise-wide Application: QRM is not just a shop floor approach; it is applied throughout the organization including in material planning and control, supply management, and office operations.
This course is intended for managers and executives and requires no prior knowledge of QRM. It will take approximately 45 minutes to complete. It is possible to exit the course at any time and return to resume where you left off.

System Requirements

A computer, tablet, or mobile device with high speed internet access. Desktop: The latest version of Google Chrome, Microsoft Edge, Firefox, or Safari (Mac only) Mobile: Safari in Apple iOS 10 or later; Google Chrome in Apple iOS 10 or later; Google Chrome in Android OS 4.4 or later

Reviews (2)

Giuseppe Scuderi

Giuseppe Scuderi

4
over 2 years
Shyam Bhaskar

Shyam Bhaskar

"PDF downloads have broken links.. 404 page not found errors"

5
10 months

Reduce Lead Time With Quick Response Manufacturing

Reduce Lead Time With Quick Response Manufacturing
Reduce Lead Time With Quick Response Manufacturing
This course provides an overview of QRM strategy, which includes four core concepts:

  1. The Power of Time: The numerous reasons why lead time is important (much more important than most managers realize), how it influences total operating cost and quality, and how to take advantage of this realization. 
  2. Organizational Structure: How to restructure your organization to minimize lead time throughout the enterprise, both on the shop floor and in the office.
  3. System Dynamics: How interactions between machines, people and products impact your lead times. As a result, capacity planning policies (e.g. machine and labor utilization) need to be rethought for QRM.
  4. Enterprise-wide Application: QRM is not just a shop floor approach; it is applied throughout the organization including in material planning and control, supply management, and office operations.

Related Courses